Description
Key Technical Specifications
| Parameter | Value |
|---|---|
| Microprocessor | Motorola MPC8240 (MPC60x-class PowerPC core) |
| Core Frequency | 200 MHz |
| External Bus Frequency | 66.67 MHz |
| Main Memory | 32 MB SDRAM (synchronous DRAM, 66/83 MHz bus timing) |
| On-Chip Cache | 16 KB instruction / 16 KB data |
| Flash / EEPROM | 1 MB via two 32-pin PLCC/CLCC sockets; 4 MB surface-mount flash, programmable |
| NVRAM / Clock | MK48T59 TOD clock, 8 KB NVRAM (4 KB user-available), battery-backed |
| Ethernet | 10/100 Mbps Ethernet, routed to front-panel RJ-45 |
| Serial Ports | Asynchronous serial via PC16550 controller, front-panel RJ-45 |
| Timers | Four 32-bit programmable timers, one 16-bit timer, one watchdog timer |
| PCI Expansion | One 114-pin planar PCI connector, A32/D32, 33 MHz, 5 V signaling |
| Mezzanine Support | One PMC site (IEEE P1386.1) + two PC*MIP sites (VITA 29) |
| VMEbus Interface | 6U VME64 form factor, A32/D32 |
| Power Requirements | ‘+5 V ±5%, 12.5 W typical (at 4.875–5.25 V); +12 V / −12 V unused on planar, available to mezzanine sites |
| Operating Temperature | 0 °C to +55 °C (forced air cooling) |
| Operating Humidity | 5% to 90% non-condensing |
| Vibration (operating) | 2 G RMS, 20–2,000 Hz random |
| EMC | FCC Part 15 Subpart B Class A, ICES-003 Class A, CE per EMC Directive 89/336/EEC (EN55022 Class B emissions, EN55024 immunity) |
| Firmware / Boot | Motorola PPC1-Bug / PPCBug firmware family (verify exact firmware revision against your system image before ordering) |
| OS Support | VxWorks, pSOS+, QNX, Linux for PowerPC, and other real-time OS kernels |
Verify precise parameters against the official Motorola MVME2100 datasheet for your board revision before installation.
Product Introduction
The Motorola MVME2100 is a 6U VME64 single-board computer built around the MPC8240 PowerPC processor running at 200 MHz, with 32 MB of SDRAM and 4 MB of onboard flash. It serves as a system controller and compute node in embedded industrial platforms — process control systems, test and measurement racks, defense electronics, and telecom infrastructure built through the late 1990s and 2000s.
The board earns its keep through expansion flexibility: one PMC site plus two PC*MIP sites let you add I/O without touching the VME backplane. Since Motorola exited the embedded board business (the line passed to Emerson Network Power, then to current Emerson ownership), the MVME2100 is obsolete and OEM supply is exhausted. Maintaining these boards with verified new-surplus stock is far cheaper than a chassis migration to a modern VME SBC.

MVME2100

MVME2100
Installation & Configuration Guide
Stage 1: Pre-Installation Preparation (10 minutes)
- ⚠️ Safety First: Notify operations of the downtime window, verify the system is in a safe state, lock out/tag out the chassis power, then wait 5 minutes for backplane capacitors to discharge.
- Tools Required: Grounded ESD wrist strap, ESD mat, PH1 screwdriver, Fluke 115 multimeter (or equivalent), wire labels, and a smartphone camera.
- Data Backup: Photograph the front panel, jumper positions, mezzanine configuration, and all cable connections. Record the Ethernet MAC address, IP configuration, and VMEbus address settings if documented. If the board boots, capture the PPCBug firmware banner and version string from the serial console before you pull it.
- Confirm the replacement board’s MPC8240 stepping and firmware revision against your OS BSP requirements. A 200 MHz MPC8240 is standard, but firmware revisions in the PPCBug family differ between board lots.
Stage 2: Removing the Old Module (10–15 minutes)
- Disconnect all front-panel cabling (Ethernet RJ-45, serial RJ-45). Label each cable.
- If the board hosts a PMC or PC*MIP card with front-panel I/O, disconnect and label those cables too.
- Loosen the two captive screws top and bottom of the front panel.
- Pull the board straight out using the extractor handles. Do not rock it side-to-side — that bends P1/P2 backplane pins.
- Inspect the backplane connector for bent pins or debris; blow out dust with dry, filtered air if needed.
- ⚠️ Note: Keep the old board on the bench, in an ESD bag, until the replacement is verified running. It is your fallback.
Stage 3: Installing the New Module (10 minutes)
- Ground yourself at the chassis before handling the board. Hold it by the edges only.
- Configuration Clone (Crucial): Compare the new board’s jumper settings against your photos. If your application uses a custom VMEbus base address or console port selection, mirror the exact configuration. Pay particular attention to mezzanine site configuration.
- Verify the front-panel model label reads MVME2100 and the serial number matches the invoice.
- Align P1/P2 with the backplane connectors and press firmly and evenly until the front panel seats flush. Secure the captive screws.
- Reattach all cabling per your labels.
Self-Checklist: [ ] Jumpers match photo, [ ] Board fully seated, [ ] Captive screws tight, [ ] All cables reconnected per labels
Stage 4: Power-On & Testing (15–20 minutes)
- Pre-Power Check: With the board still unpowered, meter the +5 V rail at the backplane for shorts to ground.
- Power-On Steps:
- Apply power to the chassis. Do not enable field devices yet.
- Watch the front-panel LEDs through boot. A clean boot shows activity on the status/LED indicators and a PPCBug banner on the serial console (9,600 baud, 8N1 via front-panel RJ-45 unless configured otherwise).
- Verify the firmware version string matches your records.
- Load your application image and verify the Ethernet link comes up at the correct speed (10 or 100 Mbps).
- Bring the I/O online and run a functional dry-run of the control loop.
- ⚠️ Troubleshooting Note: If the board fails to reach a firmware prompt, first reseat it — partial P1 insertion is the most common cause. If the firmware banner appears but the OS fails to boot, suspect an SDRAM or BSP mismatch before blaming the board. If Ethernet does not link, check the RJ-45 for a broken latch tab and verify the switch port is not administratively down.
Total estimated time for an experienced technician: 45–50 minutes, including functional verification.
Frequently Asked Questions (FAQ)
Q: Can I hot-swap the MVME2100 under power?
No. This is a standard VMEbus CPU board, not a live-insertion design. Pulling it with the chassis powered risks backplane transients that can damage adjacent boards — including I/O cards carrying live field signals. Kill the power, verify with a meter, then pull it. Honestly, the 5-minute capacitor wait annoys everyone, but I’ve seen a rushed hot-pull take out a $4,000 I/O board next door. Not worth it.
Q: Is this model obsolete, and are your units genuinely new?
Yes, the MVME2100 is obsolete — Motorola Computer Group exited the embedded board business over a decade ago and the line passed to Emerson. OEM stock is gone. Our units are New Original / New Surplus: factory-produced boards held in distributor or OEM spares inventory, never deployed. Each unit ships with its inbound traceability record. Refurbished, fully tested boards are also available at a lower price and are clearly labeled as such — we never mix the two.
Q: What is the direct replacement if the MVME2100 is out of stock?
Within the Motorola/Emerson family, the MVME2300 series is the closest functional successor (higher-performance PowerPC, VME64, similar PMC expansion) — but it is not pin-for-pin drop-in: it uses a different processor generation, so your BSP, firmware, and possibly mezzanine carriers must change. If your application software is not easily rebuilt, sourcing another MVME2100 is almost always the lower-risk path. Ask us about current stock on both options.
Q: Will I lose my application software when I pull the old board?
Depends on where your application lives. If it loads from the 4 MB onboard flash or the mezzanine storage, you must back it up first — connect via the serial console and PPCBug, or pull the PLCC/CLCC EEPROM sockets only if you know your image layout. If the application loads over the network at boot (common with VxWorks bootrom setups), you are fine; the new board will pull it down over Ethernet like the old one did. Confirm this before removing anything.
Q: Why is your price lower than OEM list price?
OEM list price reflects the original cost of new production, which no longer exists. New-surplus stock was purchased years ago at volume pricing and held in bonded inventory. The hardware is identical factory production. What you give up is OEM warranty and support — which we replace with our own testing process (power-on verification, serial console boot test, Ethernet link test, and >24-hour burn-in with thermal monitoring on a genuine VME test chassis) and a 1-year replacement warranty. Test reports, photos, and video of your specific board’s power-on test are available before shipment.
Q: Do you test the boards before shipping?
Yes, every unit — new surplus or refurbished — goes through the same QC process: inbound inspection with serial number verification and anti-counterfeit checks, power-up on a genuine VME backplane with a known-good chassis, PPCBug boot verification, Ethernet link and throughput test, serial port loopback test, and a minimum 24-hour continuous-run burn-in with thermal checks. QC sign-off, ESD bagging, and protective boxing are standard on every order.
Q: What condition options do you offer, and what’s the difference?
- New Original (New Surplus): Factory production, never deployed, original packaging or OEM spares labeling. Highest price, cosmetically pristine.
- Refurbished (tested): Pulled from working decommissioned systems, cleaned, recapped if needed, and fully load-tested. Better value, same warranty.
- Both carry our 1-year replacement warranty and individual test reports. If a batch matters to you (date codes, stepping, serial ranges), tell us when ordering and we’ll match from inventory.

WhatsApp: +86 16626708626
Email:
Phone: +86 16626708626