Sale!

Motorola MVME2305-900 16 MB ECC DRAM VME Single Board Computer

  • Model: MVME2305-900
  • Brand: Motorola Computer Group (product line later owned by Emerson Network Power)
  • Series: Motorola MVME2300 series (PowerPC VME64x SBC family)
  • Core Function: High-performance VMEbus single-board computer for real-time control
  • Product Type: VMEbus CPU / Single Board Computer (SBC)
  • Key Specs: MPC604 PowerPC @ 300 MHz; 16 MB ECC DRAM; 5 MB Flash; “-900” = original-style VMEbus ejector configuration
  • ⚠️ Obsolete Model — Limited Stock Available
  • Condition: New Original / New Surplus (Refurbished, fully tested units also available — condition stated per unit at order confirmation)
Categories: , , , , SKU: MVME2305-900 Brand:

Description

Key Technical Specifications

Parameter Value
Microprocessor Motorola MPC604 PowerPC
Core Frequency 300 MHz
Main Memory 16 MB ECC DRAM (ECC-corrected single-bit errors, board-level detection)
Flash Memory 5 MB onboard boot/application flash
VMEbus Interface VME64x, 6U form factor; A32/D32 plus block transfer modes via the PCI-to-VME bridge
Ethernet 10/100 Mbps Ethernet (10/100Base-T, front-panel RJ-45)
Serial Ports Two asynchronous RS-232 serial ports via front-panel RJ-45
Parallel Port One 8-bit bidirectional parallel interface (Centronics-style)
Mezzanine Expansion PMC sites per the MVME2300-series mechanical layout (verify site count against board datasheet for your exact revision)
Timers Onboard programmable timers plus watchdog timer
Real-Time Clock Battery-backed TOD clock with NVRAM
Form Factor 6U VME, single-slot; “-900” denotes original-style VMEbus ejectors
Power Requirements ‘+5 V DC, chassis-supplied via P1/P2 (calculate rack budget; see FAQ)
Operating Temperature 0 °C to +55 °C with forced-air cooling (typical for MVME2300 series; verify against datasheet)
Firmware / Boot Motorola PPC1-Bug / PPCBug firmware family
OS Support VxWorks, pSOS+, QNX, Linux for PowerPC, Windows-based RT kernels, LynxOS

Verify precise parameters against the official Motorola MVME2301–MVME2308 specification sheet for your board revision before installation. The -900 suffix matters mechanically: it denotes the original-style VMEbus ejector, which affects front-panel fit in some tightly packed chassis.

 

Product Introduction

The Motorola MVME2305-900 is a 6U VME64x single-board computer from the MVME2300 series, built on a 300 MHz MPC604 PowerPC processor with 16 MB of ECC DRAM and 5 MB of onboard flash. It functions as a system controller or compute node in embedded VME racks — industrial automation controllers, test and measurement systems, telecom infrastructure, and defense electronics.

The 2300 series earns its place through a bridged VME64x architecture that moves data between the processor’s PCI bus and the VME backplane with block-transfer support, and its ECC memory, which corrects single-bit errors — the reason these boards ran for years in systems where a random reboot was unacceptable. Since Motorola exited the embedded board business and the line passed to Emerson, the MVME2305 is obsolete with no OEM channel. Sourcing verified new-surplus boards is far cheaper than a chassis migration.

MVME2305-900

MVME2305-900

MVME2305-900

MVME2305-900

Installation & Configuration Guide

Stage 1: Pre-Installation Preparation (10 minutes)

  • ⚠️ Safety First: Notify operations of the downtime window, verify the system is in a safe state, lock out/tag out chassis power, and wait 5 minutes for backplane capacitors to discharge before touching anything.
  • Tools Required: Grounded ESD wrist strap, ESD mat, PH1 screwdriver, Fluke 115 multimeter (or equivalent), wire labels, smartphone camera.
  • Data Backup: Photograph the front panel, jumper/JTAG configurations, and every cable connection. Record the Ethernet MAC and IP configuration. If the old board still boots, capture the PPCBug firmware banner and revision from the serial console (default 9,600 baud, 8N1 via front-panel RJ-45). Note the VMEbus system controller jumper setting — if this board is the system controller, the replacement must match.
  • Confirm the replacement’s MPC604 stepping and PPCBug firmware revision against your OS BSP requirements. Firmware revisions in the PPCBug family differ between board lots and can change boot behavior.

Stage 2: Removing the Old Module (10–15 minutes)

  1. Disconnect front-panel cabling: Ethernet RJ-45, both serial RJ-45 connectors, parallel port. Label each one.
  2. If a PMC mezzanine card with front-panel I/O is populated, disconnect and label those cables too.
  3. Loosen the two captive screws top and bottom of the front panel.
  4. Using the ejectors, pull the board straight out. Never rock it side-to-side — that bends P1/P2 backplane pins.
  5. Inspect the backplane connectors for bent pins and debris. Blow out dust with dry, filtered air if needed.
  • ⚠️ Note: Keep the old board in an ESD bag on the bench until the replacement is verified running. It’s your fallback.

Stage 3: Installing the New Module (10 minutes)

  1. Ground yourself at the chassis. Handle the board by the edges only.
  2. Configuration Clone (Crucial): Compare the new board’s jumper settings against your photos — system controller enable, VMEbus base addresses, console port selection. Mirror them exactly. A mismatched system-controller jumper is a classic cause of a chassis full of boards that all refuse to arbitrate.
  3. Verify the front-panel label reads MVME2305-900 and the serial number matches your invoice.
  4. Align P1/P2 evenly with the backplane connectors and press firmly until the front panel seats flush. Secure the captive screws.
  5. Reattach all cabling per your labels.

Self-Checklist: [ ] Jumpers match photo, [ ] Board fully seated, [ ] Captive screws tight, [ ] All cables reconnected per labels

Stage 4: Power-On & Testing (15–20 minutes)

  • Pre-Power Check: Meter the +5 V rail at the backplane for shorts to ground before applying power.
  • Power-On Steps:
    1. Apply chassis power. Leave field devices offline.
    2. Watch the front-panel LEDs through boot. A clean boot shows activity indicators and a PPCBug banner on the serial console.
    3. Verify the firmware version string matches your records.
    4. Load your application image; verify the Ethernet link comes up at the correct speed.
    5. Bring I/O online and run a functional dry-run of the control loop, including a VMEbus block-transfer test if your application depends on DMA throughput.
  • ⚠️ Troubleshooting Note: If the board fails to reach a firmware prompt, reseat it first — partial P1 insertion is the most common cause. If PPCBug boots but your OS panics on memory, check that the ECC DRAM size matches what your BSP expects. If no Ethernet link, check the RJ-45 latch tab and the switch port. If the whole chassis misbehaves after the swap, revisit the system-controller jumper.

Total estimated time for an experienced technician: 45–50 minutes, including functional verification.

 

Frequently Asked Questions (FAQ)

Q: Can I hot-swap the MVME2305-900 under power?
No. This is a standard VME64x CPU board, not a live-insertion design. Pulling it hot risks backplane transients that can damage adjacent boards, and if it’s acting as VMEbus system controller, yanking it mid-arbitration can hang the entire chassis. Kill the power, meter the rails, then pull it. The 5-minute capacitor wait frustrates everyone, but I’ve seen a rushed hot-pull take out a neighboring I/O board. Not worth the two minutes saved.

Q: Is this model obsolete, and are your units genuinely new?
Yes — the MVME2305 is obsolete. Motorola Computer Group exited the embedded board business years ago and the product line passed to Emerson Network Power; no OEM manufacturing channel remains. Our units are New Original / New Surplus: factory-built boards held in distributor or OEM spares inventory, never deployed, with inbound traceability records. Refurbished, fully load-tested boards are also available at lower cost, clearly labeled as such. We never mix conditions or mislabel a pulled board as new.

Q: What is the direct replacement if the MVME2305-900 is out of stock?
Two paths. First, other members of the same MVME2300 series — the MVME2306/2307 differ mainly in ECC DRAM size (32/64 MB vs 16 MB), so a BSP memory-mapping change may be all that’s needed; confirm with your BSP documentation. Second, the MVME2400 series offers higher performance in the same 6U VME64x form factor, but it is not drop-in: different processor generation, different firmware, BSP rebuild required. If your application software can’t be easily rebuilt, sourcing another MVME2305-900 is almost always the lower-risk path. Ask us about current stock on both.

Q: What does the -900 suffix actually mean?
It denotes the original-style VMEbus ejector configuration. Functionally the board is a standard MVME2305; mechanically, the ejector style can matter in tightly packed chassis or with certain front-panel adapters. If you’re replacing an existing MVME2305-900 in the same slot, order the -900 to guarantee the front panel matches. Verify against your chassis drawings if in doubt.

Q: Will I lose my application software when I pull the old board?
Depends on where the image lives. If it boots from the 5 MB onboard flash, back it up before removal — connect via serial console and PPCBug and capture the image to a host over Ethernet or serial. If it loads over the network at boot (common with VxWorks bootrom setups), the new board pulls it down unchanged. Either way, confirm this before pulling anything. If you don’t have a copy of the application image and its source, do not remove the board until you do — recovering a dead flash with no backup is a very bad week.

Q: Why is your price lower than the original OEM list price?
OEM list price reflected active production, which no longer exists. New-surplus stock was bought years ago at volume pricing and held in inventory. The hardware is identical factory production. What you give up is OEM warranty and support — which we replace with our own QC process and a 1-year replacement warranty.

Q: Do you test the boards before shipping?
Yes, every unit — new surplus or refurbished — goes through the same process: inbound inspection with serial-number verification and anti-counterfeit checks, power-up on a genuine VME test chassis with a known-good backplane, PPCBug boot verification, Ethernet link and throughput test, serial port loopback test, ECC DRAM memory test, and a minimum 24-hour continuous burn-in with thermal monitoring. You get the test report with your board, and power-on photos or video for your specific serial number are available before shipment.