Key Technical Specifications
| Parameter | Value |
|---|---|
| Manufacturer | Schenck Process |
| Model | FNTL001 |
| Alternative Part Number | FNT-L001 / K002070.01 |
| Product Type | Industrial switching power supply |
| Application | Schenck DISOCONT weighing and control systems |
| Input Voltage | 230 VAC |
| Input Frequency | 47–63 Hz |
| Output Power | 100 W |
| Output Current | 2 A |
| Output Voltage | DC output (verify exact configured output before replacement) |
| Mounting Type | Control cabinet installation |
| System Role | Control electronics power supply |
| Protection | Industrial power supply protection functions |
| Manufacturer Status | Discontinued / legacy component |
The Schenck FNTL001 (FNT-L001, K002070.01) is identified as a 100 W, 2 A, 230 VAC power supply module used in Schenck industrial control equipment. Current industrial spare-part listings identify FNT-L001 as a discontinued Schenck power supply component.
Product Introduction
The Schenck FNTL001 K002070.01 is an industrial switching power supply module designed for Schenck control systems, including legacy DISOCONT-based weighing and process-control equipment. It provides regulated power for connected control electronics inside automation cabinets.
The unit is mainly sourced today as a maintenance spare for existing installations. Because FNTL001 is a legacy component, replacement work should verify the complete part number, cabinet wiring, output voltage requirements, and connected load before installation.
Installation & Configuration Guide
Stage 1: Pre-Installation Preparation — Approximately 15 Minutes
⚠️ Safety First: Notify production personnel before replacing the FNTL001. Shut down the controlled process, isolate cabinet power using the site’s lockout/tagout procedure, and wait at least 5 minutes for capacitor discharge.
Tools Required:
- ESD wrist strap
- Digital multimeter
- Insulated screwdriver set
- Wire labels
- Smartphone for wiring photographs
- Laptop for system documentation if required
Data Backup:
- Record the complete power supply label:
- FNTL001
- FNT-L001
- K002070.01
- Photograph:
- AC input wiring
- DC output wiring
- Terminal markings
- Module mounting position
- Record connected load information.
- Verify the downstream Schenck controller or weighing electronics model.
- Measure existing output voltage before removal.
⚠️ Important: Do not replace an industrial power supply only by matching physical dimensions. A different output voltage or current rating can damage the connected controller.
Stage 2: Removing the Old Module — Approximately 10 Minutes
- Switch off the cabinet main power supply.
- Confirm zero voltage on the AC input terminals with a multimeter.
- Verify stored energy has discharged.
- Label every wire before removal.
- Disconnect AC input wiring.
- Disconnect DC output wiring.
- Release DIN rail or mounting hardware.
- Remove the carefully.
- Inspect:
- Terminal blocks
- Wire insulation
- Cabinet ventilation
- Adjacent modules for heat damage
⚠️ Note: Keep the original until the replacement has been tested. It provides a reference for wiring and system configuration.
Stage 3: Installing the New — Approximately 10 Minutes
- Verify the replacement marking matches / K002070.01.
- Check that the unit condition matches the purchase specification:
- New Original / New Surplus
- Refurbished (tested)
- Install the power supply in the original cabinet position.
- Connect AC input wiring according to the original documentation.
- Connect DC output wiring with correct polarity.
- Tighten terminals according to terminal manufacturer specifications.
- Verify protective earth connection if applicable.
Self-Checklist:
- Correct model confirmed
- Input voltage verified
- Output voltage verified
- Polarity checked
- Terminals secured
- Ground connection checked
- Cabinet airflow unobstructed
Stage 4: Power-On & Testing — Approximately 15 Minutes
- Perform a final wiring inspection before energizing.
- Restore cabinet power.
- Measure DC output voltage.
- Check power supply status indicators if available.
- Verify the Schenck controller starts normally.
- Check connected weighing/control modules.
- Monitor the system for:
- Unexpected resets
- Communication faults
- Low-voltage alarms
- Excessive heating
⚠️ Troubleshooting Note:
- Controller does not start: Check output voltage, polarity, and load current.
- Repeated power cycling: Check for downstream short circuits or excessive load.
- Voltage drops under load: Verify the connected equipment current requirement does not exceed the 100 W supply rating.

FNTL001

FNTL001
Frequently Asked Questions (FAQ)
Can the Schenck be hot-swapped?
No. The is an AC-powered industrial power supply. Remove power before replacement. Working on energized 230 VAC terminals creates both electrical safety and equipment damage risks.
Is the Schenck obsolete?
Yes. Industrial spare-part databases identify the FNT-L001 as a discontinued Schenck power supply module. Remaining units are generally supplied from surplus inventory or refurbished stock channels.
What is the difference between and FNT-L001?
They refer to the same Schenck component designation style. Suppliers may write the part number differently:
- FNT L001
Always verify the additional material number, such as K002070.01, before ordering.
What input voltage does require?
Available industrial listings identify the as a 230 VAC input, 100 W, 2 A power supply module. Confirm the exact nameplate information on your installed unit before replacement.
Can I replace with any 100 W power supply?
No. A generic 100 W supply may not match the mechanical installation, terminal arrangement, output characteristics, or system requirements of Schenck equipment. Verify voltage, current capacity, mounting method, and compatibility with the connected controller.
Why is the price lower than a new OEM power supply?
Legacy automation components are often available through unused plant inventory, equipment upgrades, or machine decommissioning projects. The price difference usually depends on stock condition, testing process, warranty terms, and availability.
What should I request before purchasing a surplus ?
For New Original / New Surplus units, request:
- Actual product photos
- Nameplate photo
- Material number verification
- Power-on test record
- Warranty terms
For Refurbished (tested) units, request:
- Output voltage test results
- Load test report
- Inspection record
For critical weighing or batching systems, verify the complete Schenck cabinet configuration before installation.